Offshore structures
Floating wharf
Name | Floating wharf | ||||
Person of ordering | Hitachi Zosen Corporation | ||||
The completion | March, 1998 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ||||
Consulting | Research | Development study | Production, procurement | Installation | |
Multiplication | Construction management | Others | |||
Explanation | This floating wharf for high speed vessel was designed utilizing KDC's know-how on floating structure, mooring system, etc. |
Harsh environment jack-up drilling oil rig
Name | Harsh environment jack-up drilling oil rig | ||||
Person of ordering | Hitachi Zosen Corporation | ||||
The completion | June, 1984 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ||||
Consulting | Research | Development study | Production, procurement | Installation | |
Multiplication | Construction management | Others | |||
Explanation | KDC carried out a part of structure and outfitting design of the jack-up drilling oil rig, North Sea type with operating water depth up to 350 feet. |
Large jack up rig "Dan duke"
Name | Large jack up rig "Dan duke" | ||||
Person of ordering | Hitachi Zosen Corporation | ||||
The completion | June, 1980 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ||||
Consulting | Research | Development study | Production, procurement | Installation | |
Multiplication | Construction management | Others | |||
Explanation |
This rig can work at 70.0m in length, 76.0m in width, leg 118m in length in a sea area of depth of the water about 83m. We are postures
I was in charge of a construction meter, a part of the gi meter to install.
|
Floating breakwater
Name | Floating breakwater | ||||
Person of ordering | Hitachi Zosen Corporation | ||||
The completion | February, 2001 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | |||||
Consulting | Research | Development study | Production, procurement | Installation | |
Multiplication | Construction management | Others | |||
Explanation | This was a Hitachi Zosen type floating breakwater, and KDC developed key plan and designed mooring system. |
Buoy for observation of tsunamis
Name | Buoy for observation of tsunamis | ||||
Person of ordering | Hitachi Zosen Corporation | ||||
The completion | July, 2007 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ◯ | |||
Consulting | Research | Development study | Production, procurement | Installation | |
Multiplication | Construction management | Others | |||
Explanation | KDC's scope of works were structure and mooring design of the buoy which can observe tsunamis by means of GPS. |
Self-Elevating Platform (SEP) for Boring
Name | Self-Elevating Platform (SEP) for Boring | ||||
Person of ordering | Domestic geological survey consultant | ||||
The completion | November, 1999 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ||||
Consulting | Research | Development study | Production, procurement | Installation | |
◯ | |||||
Multiplication | Construction management | Others | |||
Explanation | KDC carried out design and manufacture of the SEP which can be operated up to the water depth of 20m. |
Jacket for Boring
Name | Jacket for Boring | ||||
Person of ordering | Domestic geological survey consultant | ||||
The completion | November, 1999 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ||||
Consulting | Research | Development study | Production, procurement | Installation | |
◯ | |||||
Multiplication | Construction management | Others | |||
Explanation | KDC carried out design and manufacture of the jacket for boring sea bed of the water depth up to 25m. |
Name | Feasibility Study on the System for CO2 Sequestration in the Deep Sea | ||||
Person of ordering | Sumitomo Metal Industries, Ltd. | ||||
The completion | March, 2000 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ||||
Consulting | Research | Development study | Production, procurement | Installation | |
Multiplication | Construction management | Others | |||
Explanation | This system was proposed under joint study with Sumitomo Metal to collect CO2 from Power Plant and to sequestrate into the deep sea by means of Gas Lift Advanced and Dissolution System (GLAD). KDC designed floating structure and mooring system. |