Industrial Machinery
Pneumatic Capsule Transfer and Handling System
Name | Pneumatic Capsule Transfer and Handling System | ||||
Person of ordering | Sumitomo Metal Industries, Ltd. | ||||
The completion | March, 1999 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ◯ | ◯ | ||
Consulting | Research | Development study | Production, procurement | Installation | |
◯ | ◯ | ||||
Multiplication | Construction management | Others | |||
◯ | |||||
Explanation | KDC developed and manufactured devices to make smooth discharge of excavated rock and sand from capsules conveyed by pneumatic transfer system. <testing equipment main essential points> Duct line diameter: φ 700mm Full length: 4m Live load: 700 kg (0.6㎥) Transportation speed: 30m/min. |
Name | Pneumatic Vertical Capsule Transfer System | ||||
Person of ordering | Kajima Corporation/Sumitomo Metal Industries, Ltd. | ||||
The completion | December, 1999 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ◯ | ◯ | ||
Consulting | Research | Development study | Production, procurement | Installation | |
◯ | ◯ | ||||
Multiplication | Construction management | Others | |||
◯ | |||||
Explanation | This is a pneumatic capsule transfer system through a shaft to transport excavated rock and sand. The system, which can cover up to the depth of 1000m, was developed by the project team for joint study by Kajima Corporation, Sumitomo Metal and KDC. KDC joined the study from planning to installation. <the main essential points> Ability for conveyance: 10m3/h Duct line diameter: φ 800mm Capsule capacity: 0.35m3 Conveyance speed: 3m/sec. |
Hakodate Port Highway ship boarding bridge
Name | Boarding bridge for the Hakodate Port Highway ship | ||||
Person of ordering | Sojitz | ||||
The completion | August, 2007 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ◯ | |||
Consulting | Research | Development study | Production, procurement | Installation | |
◯ | ◯ | ||||
Multiplication | Construction management | Others | |||
Explanation |
Tie up a high-speed ship to a terminal building of the blue box ferry (Aomori Hakodate/Higashi Nihon Ferry) Hakodate Port; is movable
A boarding bridge.
Our company performs an entry, a design, production from a plan stage. In May, 2008, I accept an order of the same model in the Aomori Port. <the main essential points>
Mayor of bridge: 50m The tip going up and down stroke: 2.5m Exterior: Aluminum + Teflon painting |