Industrial Machinery

Pneumatic Capsule Transfer and Handling System

Name Pneumatic Capsule Transfer and Handling System
Person of ordering Sumitomo Metal Industries, Ltd.
The completion March, 1999
The main dutiesPlan, planDevelopment designBasic designDetailed designAnalysis
 
ConsultingResearchDevelopment studyProduction, procurementInstallation
   
MultiplicationConstruction managementOthers  
    
Explanation
 KDC developed and manufactured devices to make smooth discharge of excavated rock and sand from capsules conveyed by pneumatic transfer system.
 <testing equipment main essential points>
Duct line diameter: φ 700mm
Full length: 4m
Live load: 700 kg (0.6㎥)
 Transportation speed: 30m/min.
 

Pneumatic Vertical Capsule Transfer System

Name Pneumatic Vertical Capsule Transfer System
Person of ordering Kajima Corporation/Sumitomo Metal Industries, Ltd.
The completion December, 1999
The main dutiesPlan, planDevelopment designBasic designDetailed designAnalysis
 
ConsultingResearchDevelopment studyProduction, procurementInstallation
   
MultiplicationConstruction managementOthers  
    
Explanation
 This is a pneumatic capsule transfer system through a shaft to transport excavated rock and sand.
 The system, which can cover up to the depth of 1000m, was developed by the project team for joint study by Kajima Corporation, Sumitomo Metal and KDC.
 KDC joined the study from planning to installation.

<the main essential points>
Ability for conveyance: 10m3/h
Duct line diameter: φ 800mm
Capsule capacity: 0.35m3
 Conveyance speed: 3m/sec.
 

Hakodate Port Highway ship boarding bridge

Name  Boarding bridge for the Hakodate Port Highway ship
Person of ordering  Sojitz
The completion  August, 2007
The main duties Plan, plan Development design Basic design Detailed design Analysis
 
Consulting Research Development study Production, procurement Installation
     
Multiplication Construction management Others    
         
Explanation
 Tie up a high-speed ship to a terminal building of the blue box ferry (Aomori Hakodate/Higashi Nihon Ferry) Hakodate Port; is movable
 A boarding bridge.
 Our company performs an entry, a design, production from a plan stage.
 In May, 2008, I accept an order of the same model in the Aomori Port.
 <the main essential points>
 Mayor of bridge: 50m
 The tip going up and down stroke: 2.5m
 Exterior: Aluminum + Teflon painting
 