Other Steel Structures
Coal Bunkers
Name | Coal Bunkers | ||||
Person of ordering | Babcock-Hitachi | ||||
The completion | March, 2000 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ||||
Consulting | Research | Development study | Production, procurement | Installation | |
Multiplication | Construction management | Others | |||
Explanation | These coal bunkers are for a thermal power plant. KDC carried out basic design, detail design and study of transportation to the site. |
Large Scale Coal Silos
Name | Large Scale Coal Silos | ||||
Person of ordering | Hitachi Zosen Corporation | ||||
The completion | March, 1999 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ◯ | |||
Consulting | Research | Development study | Production, procurement | Installation | |
Multiplication | Construction management | Others | |||
◯ | |||||
Explanation | The diameter and height are 35m and 47m respectively and the capacity is 3,000 tons. KDC carried out basic design, detail design and proposed economical structure by means of FE analysis. |
Water Tank for Fire Extinguishing
Name | Water Tank for Fire Extinguishing | ||||
Person of ordering | COPROS Co., Ltd. | ||||
The completion | September, 1999 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ||||
Consulting | Research | Development study | Production, procurement | Installation | |
Multiplication | Construction management | Others | |||
The authorized acquisition | |||||
Explanation | KDC developed the water tank for extinguishing fire to obtain type approval and individual certificate of Fire Equipment and Safety Center of Japan, utilizing the technology of shaft construction work of drainage system owned by COPROS Co., Ltd. |
Name | Flap type Steel Gate for Dry Dock | ||||
Person of ordering | Domestic shipyard | ||||
The completion | March, 1999 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ◯ | |||
Consulting | Research | Development study | Production, procurement | Installation | |
Multiplication | Construction management | Others | |||
Explanation | This gate can be opened and closed rotating about hinges located at the bottom by mean of winches. The operating time is remarkably shortened compared with floating type gate. KDC experienced five cases. |
Name | Evaluation of Earthquake Resistance for an Elevated Water Tank | ||||
Person of ordering | Chugai Technos Corporation | ||||
The completion | October, 2006 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
Consulting | Research | Development study | Production, procurement | Installation | |
Multiplication | Construction management | Others | |||
◯ | |||||
Explanation | KDC evaluated earthquake resistance for an elevated water tank considering deterioration for 30 years since newly constructed. |